The CMS detector will undergo a major upgrade for Phase-2 of the LHC program, starting around 2026. The upgraded Level-1 hardware trigger will select events at a rate of 750 kHz. At an expected event size of 7.4 MB this corresponds to a data rate of up to 50 Tbit/s. Optical links will carry the signals from on-detector front-end electronics to back-end electronics in ATCA crates in the service cavern. A DAQ and Timing Hub board aggregates data streams from back-end boards over point-to-point links, provides buffering and transmits the data to the commercial data-to-surface network for processing and storage. This hub board is also responsible for the distribution of timing, control and trigger signals to the back-ends. This paper presents the current development towards the DAQ and Timing